To repair water damage on the Seahorse Condominiums building envelope, work was performed one window stack at a time. The process involved replacing the old siding and weather barrier with brick-sealed James Hardie shake-style siding, replacing damaged sub-layers (sheathing, framing, insulation, and brick sections), and reinstalling or upgrading windows to Marvin Elevate sliders with fresh flashing and sealant, before ultimately restoring the interior trim and window coverings.
